
Critical Path
The Critical Series, Book 2
Failed to add items
Add to Cart failed.
Add to Wish List failed.
Remove from wishlist failed.
Adding to library failed
Follow podcast failed
Unfollow podcast failed
3 months free
Buy for $27.99
No default payment method selected.
We are sorry. We are not allowed to sell this product with the selected payment method
-
Narrated by:
-
Luke Daniels
-
By:
-
Darren Wearmouth
About this listen
Destroying the croatoan's seat of power has grave consequences. Earth faces destruction unless bitter enemies can work together.
Earth is recovering after Denver and his group managed to stamp out the immediate alien threat. Now Denver and his team, stationed in a liberated croatoan farm, plan to restore humanity as the dominant force. But when shocking information comes to light, they set off on an immediate mission north.
The team encounter a hybrid city where humans and croatoans live and work together. It's here in this strange new civilization that Denver discovers there's a bigger threat to the planet than the aliens already on the surface: Something far more terrible is coming. It'll be a race against the clock to defeat this new threat, and Denver will need all the help he can get.
©2016 Colin F. Barnes; 2016 Darren Wearmouth (P)2016 Podium PublishingListeners also enjoyed...
-
Infinite
- By: Jeremy Robinson
- Narrated by: R.C. Bray
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Galahad, a faster-than-light spacecraft, carries 50 scientists and engineers on a mission to prepare Kepler 452b, Earth's nearest habitable neighbor at 1400 light years away. With Earth no longer habitable and the Mars colony slowly failing, they are humanity's best hope. After 10 years in a failed cryogenic bed - body asleep, mind awake - William Chanokh's torture comes to an end as the fog clears, the hatch opens, and his friend and fellow hacker, Tom, greets him...by stabbing a screwdriver into his heart. This is the first time William dies.
-
-
a rather complex science fiction story
- By Midwestbonsai on 12-26-17
By: Jeremy Robinson
-
Ruins of the Earth
- Ruins of the Earth, Book 1
- By: Christopher Hopper, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 15 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
A secret buried in the Antarctic. A puzzle unsolved for thousands of years. And a Brooklyn-born master gunnery sergeant who's royally pissed that he has to babysit the researchers sent to figure it all out. But when Patrick "Wic" Finnegan finally sees what the team has uncovered, he can't believe his eyes, nor is he prepared for the violence to come. Soon, the portal opens and unleashes a storm of unbridled fury upon humanity.
-
-
I really wanted to like this.
- By Jeremy Korpi on 04-06-21
By: Christopher Hopper, and others
-
The Crypt: Shakedown
- The Crypt, Book 1
- By: Scott Sigler
- Narrated by: Ray Porter
- Length: 16 hrs and 57 mins
- Unabridged
-
Overall
-
Performance
-
Story
Few know the warship’s actual name. But everyone has heard the rumors. The PUV James Keeling can do something no other vessel in existence can do—slip into another dimension, travel undetected, then re-emerge onto our plane and surprise enemy targets. But the thing that makes the Crypt unique also makes it a nightmare for those onboard; interdimensional travel causes hallucinations, violent behavior, and psychotic breakdowns. Keeling could be the Union’s greatest weapon, a game-changing asset that can defeat the bloodthirsty zealots of the Purist Nation, the Union’s mortal enemy.
-
-
classic sigler
- By martin on 10-05-23
By: Scott Sigler
-
Lock In (Narrated by Amber Benson)
- By: John Scalzi
- Narrated by: Amber Benson
- Length: 10 hrs and 56 mins
- Unabridged
-
Overall
-
Performance
-
Story
Not too long from today, a new, highly contagious virus makes its way across the globe. Most who get sick experience nothing worse than flu, fever, and headaches. But for the unlucky one percent - and nearly five million souls in the United States alone - the disease causes "Lock In": Victims fully awake and aware, but unable to move or respond to stimulus. The disease affects young, old, rich, poor, people of every color and creed. The world changes to meet the challenge.
-
-
Love Amber's Narration
- By Anthony on 09-11-14
By: John Scalzi
-
Contamination Super Boxed Set (Books 0-7)
- The Complete Post-Apocalyptic Series
- By: T.W. Piperbrook
- Narrated by: Troy Duran
- Length: 34 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
The infection has begun, ravaging the American Southwest and leaving chaos in its wake. In this new world, there will be no last meal, no dying wish. The only reward left is to survive another day...The complete Contamination series - all in this one, special edition.
-
-
absolute garbage writing.
- By James mullins on 04-23-22
By: T.W. Piperbrook
-
Wayward Galaxy
- Wayward Galaxy, Book 1
- By: Jason Anspach, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 12 hrs and 49 mins
- Unabridged
-
Overall
-
Performance
-
Story
A company of Army Rangers is sent on an interstellar colony ship to secure a foothold on a dangerous, alien planet through violence of action. Leaving behind a warring Earth flung headfirst into a conflict of mutual assured destruction, the Rangers and the accompanying crew of first colonists are guided on a 40-year journey by an unprecedented artificial intelligence. But when they emerge from the frigid embrace of cryosleep, they awake to a nightmare, finding themselves greeted by the same ruthless enemy that brought about the ruin of Earth.
-
-
A breath of fresh air
- By Anonymous User on 09-29-20
By: Jason Anspach, and others
-
Infinite
- By: Jeremy Robinson
- Narrated by: R.C. Bray
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Galahad, a faster-than-light spacecraft, carries 50 scientists and engineers on a mission to prepare Kepler 452b, Earth's nearest habitable neighbor at 1400 light years away. With Earth no longer habitable and the Mars colony slowly failing, they are humanity's best hope. After 10 years in a failed cryogenic bed - body asleep, mind awake - William Chanokh's torture comes to an end as the fog clears, the hatch opens, and his friend and fellow hacker, Tom, greets him...by stabbing a screwdriver into his heart. This is the first time William dies.
-
-
a rather complex science fiction story
- By Midwestbonsai on 12-26-17
By: Jeremy Robinson
-
Ruins of the Earth
- Ruins of the Earth, Book 1
- By: Christopher Hopper, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 15 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
A secret buried in the Antarctic. A puzzle unsolved for thousands of years. And a Brooklyn-born master gunnery sergeant who's royally pissed that he has to babysit the researchers sent to figure it all out. But when Patrick "Wic" Finnegan finally sees what the team has uncovered, he can't believe his eyes, nor is he prepared for the violence to come. Soon, the portal opens and unleashes a storm of unbridled fury upon humanity.
-
-
I really wanted to like this.
- By Jeremy Korpi on 04-06-21
By: Christopher Hopper, and others
-
The Crypt: Shakedown
- The Crypt, Book 1
- By: Scott Sigler
- Narrated by: Ray Porter
- Length: 16 hrs and 57 mins
- Unabridged
-
Overall
-
Performance
-
Story
Few know the warship’s actual name. But everyone has heard the rumors. The PUV James Keeling can do something no other vessel in existence can do—slip into another dimension, travel undetected, then re-emerge onto our plane and surprise enemy targets. But the thing that makes the Crypt unique also makes it a nightmare for those onboard; interdimensional travel causes hallucinations, violent behavior, and psychotic breakdowns. Keeling could be the Union’s greatest weapon, a game-changing asset that can defeat the bloodthirsty zealots of the Purist Nation, the Union’s mortal enemy.
-
-
classic sigler
- By martin on 10-05-23
By: Scott Sigler
-
Lock In (Narrated by Amber Benson)
- By: John Scalzi
- Narrated by: Amber Benson
- Length: 10 hrs and 56 mins
- Unabridged
-
Overall
-
Performance
-
Story
Not too long from today, a new, highly contagious virus makes its way across the globe. Most who get sick experience nothing worse than flu, fever, and headaches. But for the unlucky one percent - and nearly five million souls in the United States alone - the disease causes "Lock In": Victims fully awake and aware, but unable to move or respond to stimulus. The disease affects young, old, rich, poor, people of every color and creed. The world changes to meet the challenge.
-
-
Love Amber's Narration
- By Anthony on 09-11-14
By: John Scalzi
-
Contamination Super Boxed Set (Books 0-7)
- The Complete Post-Apocalyptic Series
- By: T.W. Piperbrook
- Narrated by: Troy Duran
- Length: 34 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
The infection has begun, ravaging the American Southwest and leaving chaos in its wake. In this new world, there will be no last meal, no dying wish. The only reward left is to survive another day...The complete Contamination series - all in this one, special edition.
-
-
absolute garbage writing.
- By James mullins on 04-23-22
By: T.W. Piperbrook
-
Wayward Galaxy
- Wayward Galaxy, Book 1
- By: Jason Anspach, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 12 hrs and 49 mins
- Unabridged
-
Overall
-
Performance
-
Story
A company of Army Rangers is sent on an interstellar colony ship to secure a foothold on a dangerous, alien planet through violence of action. Leaving behind a warring Earth flung headfirst into a conflict of mutual assured destruction, the Rangers and the accompanying crew of first colonists are guided on a 40-year journey by an unprecedented artificial intelligence. But when they emerge from the frigid embrace of cryosleep, they awake to a nightmare, finding themselves greeted by the same ruthless enemy that brought about the ruin of Earth.
-
-
A breath of fresh air
- By Anonymous User on 09-29-20
By: Jason Anspach, and others
-
Below Us
- The Abyss, Book 1
- By: Nathan Hystad
- Narrated by: Marc Vietor
- Length: 9 hrs and 22 mins
- Unabridged
-
Overall
-
Performance
-
Story
After a rough break up, Wyatt moves to New York City, eager to prove himself while working on Wall Street. When he’s asked to visit the father of his ex-girlfriend, a billionaire tycoon, his fate is sealed. The revolutionary company, Nu-En, launches a radical innovation, an energy that will allow every person on the planet access to power. Only it doesn’t perform as anticipated. Harnessing the ocean has consequences, and highly dangerous creatures emerge from the depths. Soon, the Earth is fracturing, and the world will never be the same.
-
-
Interesting story but..
- By Mike Fedotov on 09-28-23
By: Nathan Hystad
-
Generation Ship
- A Novel
- By: Michael Mammay
- Narrated by: Natalie Naudus
- Length: 16 hrs and 12 mins
- Unabridged
-
Overall
-
Performance
-
Story
In 2108, Colony Ship Voyager departed Earth for the planet of Promissa with 18,000 of the world’s best and brightest on board. 250 years and 27 light years later, an arrival is imminent. But all is not well. The probes that they’ve sent ahead to gather the data needed to establish any kind of settlement aren’t responding, and the information they have received has presented more questions than answers. It’s a time when the entire crew should be coming together to solve the problem, but science officer Sheila Jackson can’t get people to listen.
-
-
Little too much political shenanigans for me😬
- By Samuel Warren on 10-19-23
By: Michael Mammay
-
Hell Divers
- Hell Divers Series, Book 1
- By: Nicholas Sansbury Smith
- Narrated by: R.C. Bray
- Length: 10 hrs and 11 mins
- Unabridged
-
Overall
-
Performance
-
Story
More than two centuries after World War III poisoned the planet, the final bastion of humanity lives on massive airships circling the globe in search of a habitable area to call home. Aging and outdated, most of the ships plummeted back to Earth long ago. The only thing keeping the two surviving lifeboats in the sky are Hell Divers - men and women who risk their lives by skydiving to the surface to scavenge for parts the ships desperately need.
-
-
A little cliche action hero-y but damn good story anyway
- By Jillian Noone on 09-04-19
-
One Second After
- By: William R. Forstchen
- Narrated by: Joe Barrett
- Length: 13 hrs and 17 mins
- Unabridged
-
Overall
-
Performance
-
Story
Already cited on the floor of Congress and discussed in the corridors of the Pentagon as a book all Americans should read, One Second After is the story of a war scenario that could become all too terrifyingly real. Based upon a real weapon - the Electro Magnetic Pulse (EMP) - which may already be in the hands of our enemies, it is a truly realistic look at the awesome power of a weapon that can destroy the entire United States.
-
-
A Civil War Re-enactor Saves a Community?
- By Cidney on 07-05-12
-
Memory's Legion
- The Complete Expanse Story Collection
- By: James S. A. Corey
- Narrated by: Jefferson Mays, Daniel Abraham, Ty Franck
- Length: 16 hrs and 22 mins
- Unabridged
-
Overall
-
Performance
-
Story
On Mars, a scientist experiments with a new engine that will one day become the drive that fuels humanity's journey into the stars. On an asteroid station, a group of prisoners are oblivious to the catastrophe that awaits them. On a future Earth beset by overpopulation, pollution, and poverty, a crime boss desperately seeks to find a way off planet. On an alien world, a human family struggles to establish a colony and make a new home. All these stories and more are featured in this unmissable collection of short fiction set in the hardscrabble world of The Expanse.
-
-
Its about damn time...
- By Samuel Warren on 03-15-22
-
Steel World
- Undying Mercenaries, Book 1
- By: B. V. Larson
- Narrated by: Mark Boyett
- Length: 12 hrs and 7 mins
- Unabridged
-
Overall
-
Performance
-
Story
In the 20th century Earth sent probes, transmissions, and welcoming messages to the stars. Unfortunately, someone noticed. The Galactics arrived with their battle fleet in 2052. Rather than being exterminated under a barrage of hell-burners, Earth joined their vast Empire. Swearing allegiance to our distant alien overlords wasn't the only requirement for survival. We also had to have something of value to trade, something that neighboring planets would pay their hard-earned credits to buy. As most of the local worlds were too civilized to have a proper army, the only valuable service Earth could provide came in the form of soldiers....
-
-
A 14 year old boy’s idea of a “Real Man”
- By C. Brown on 04-16-19
By: B. V. Larson
-
E-Day
- E-Day, Book 1
- By: Nicholas Sansbury Smith
- Narrated by: R.C. Bray
- Length: 15 hrs and 10 mins
- Unabridged
-
Overall
-
Performance
-
Story
Engines. Genetically modified warriors that keep the great Nova Alliance war machine churning against the enemy Coalition. Most days, Engines are all that stand between salvation and chaos. Led by legendary Engine Captain Akira Hayashi, Shadow Squad has fought on the frontlines for a decade. They are on the brink of victory when the Coalition launches a series of desperate and devastating attacks that cripple the Nova Alliance restoration sites vital to save the dying planet.
-
-
Kicking New Series Opener! Wow!
- By Cindy on 07-09-21
-
The Trackers Series Box Set
- The Trackers Series, Books 1-4
- By: Nicholas Sansbury Smith
- Narrated by: Bronson Pinchot
- Length: 33 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
Ripped from the headlines, the explosive Trackers saga is a realistic depiction of what an EMP attack and the aftermath might look like from one of the genre's leading voices, USA Today best-selling author and former Homeland Security disaster mitigation officer Nicholas Sansbury Smith. This box set includes the entire four-book Trackers series with over 30 hours of post-apocalyptic survival fiction and action. This box set includes Trackers, Trackers 2: The Hunted, Trackers 3: The Storm, and Trackers 4: The Damned.
-
-
Honorable, brave, and selfless!
- By RJ on 11-10-18
-
Slip Runner
- By: J.N. Chaney, M.F. Lerma
- Narrated by: Neill Thorne
- Length: 8 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
Cole Riker is a Slip Runner. A contractor tasked with finding alien salvage in exchange for credits. For an ex-smuggler like Cole, there’s a catch: Don’t break the terms of parole. That means doing things by the book. Find salvage, turn it in, get paid. But everything changes when a retrieval mission lands him in a previously unknown sector. There, he finds the material he’s been sent to recover, along with something more. A brand-new form of ancient alien life.
-
-
Great Start on a new Renegade Universe Series
- By Robert Meridy Jr on 11-04-22
By: J.N. Chaney, and others
-
The Tyr: Arrival
- The Tyr Trilogy, Book 1
- By: Richard Fox
- Narrated by: R.C. Bray
- Length: 11 hrs and 35 mins
- Unabridged
-
Overall
-
Performance
-
Story
Daniel Clay fought across the galaxy as a corporate soldier. He left the violence behind for a life of science, raising a family far from the bloodshed of the Corporation. With his wife, Sarah, and son, Michael, he studied the alien Tyr for years, hidden among their complex societies. Their mission should have ended with the arrival of a replacement team. Instead, the Clays’ corporate overlords choose a death sentence: an invasion fleet to conquer the Tyr.
-
-
Very solid, almost missed it.
- By AJ Woodburn on 09-20-21
By: Richard Fox
-
Solitude
- Dimension Space, Book One
- By: Dean M. Cole
- Narrated by: R.C. Bray, Julia Whelan
- Length: 8 hrs and 50 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Martian meets Gravity when Army Pilot Vaughn Singleton, Earth’s last man, rushes to Area 51 in search of a spaceplane after he discovers the last woman is stranded on the International Space Station and barely alive - thus beginning a race against time. The event that wiped life from the planet started at the supercollider. It created a rift in space-time. The astronaut stranded aboard the space station, Commander Angela Brown, is a theoretical physicist who used to work at the collider.
-
-
Eh...
- By Philip Maddox on 10-19-17
By: Dean M. Cole
-
SecondWorld
- By: Jeremy Robinson
- Narrated by: Phil Gigante
- Length: 11 hrs and 20 mins
- Unabridged
-
Overall
-
Performance
-
Story
Lincoln Miller, an ex-Navy SEAL turned NCIS special agent, is sent to Aquarius, the world’s only sub-oceanic research facility, located off the Florida Keys, to investigate reports of ocean dumping. A week into his stay, strange red flakes descend from the surface. Scores of fish are dead and dying, poisoned by the debris that turns to powder in Miller’s fingers and tastes like blood. Miller heads for the surface, ready to fight whoever is polluting on his watch. But he finds nothing. No ships. No polluters.... No oxygen.
-
-
THE AIR TASTED LIKE BLOOD
- By Jim "The Impatient" on 10-11-16
By: Jeremy Robinson
The story was great and the performance takes it to another level. Great!
Something went wrong. Please try again in a few minutes.